2016 - 2017 Maintenance Projects

 Accomplishments for the Year

 

Pipelines: 2.25 Miles

Liners: 3.92 Miles

Concrete Panels: 65,000 sq. ft.

Polyurea Crack Sealing: 6,820 gallons

 

 

 Estimated Water Savings

3,681 Ac/Ft or...

 

1,257,786,517 Gallons or...

 

1,904 Olympic Sized Swimming Pools

 

 

Completed 2016 - 2017 Projects

 

W20H1 Pipeline

W20L7 Pipeline

W20 Buried LIner

W20B & W20F Check Gate Recoating

W35.8D Pipeline

W33B Buried Liner

Babcock Pumping Plant Paint

Babcock & Quincy PP Weed Decks

W44C7 Pipeline

W39.9E Concrete Apron

W69J Pipeline

AquaLastic Applications

W61C26 Pipeline

RB6 Pipeline

RB6A Pipeline

R85 Buried Liner

RB9 Buried Liner

Main Canal Panel Replacement

Polyurea Crack Sealing

W20 Check & Lateral Gate Painting

W53.1E Ditch Lining

W61 Ditch Lining